Practical freight planning from China

Warehouse handover

One production line, several crates: build a packing list the installer can use

“One production line, six cases” may describe a purchase order, but it gives the receiving plant no way to find the control cabinet. Build a piece-level packing list that works at factory pickup, warehouse receiving and final installation.

· Xinyang Express Logistics

Assign one ID that follows the crate

Choose a shipment reference and a piece number, such as LINE-A / 03 of 06. Put the same ID on the crate, the packing list, the photo filename and the receiving sheet. If two suppliers both use “case 1,” keep their original references in separate columns and give each piece a distinct shipment ID.

List contents in the buyer’s vocabulary

Record the buyer’s assembly or drawing reference alongside the supplier’s description. Include the final outside dimensions, gross weight, packing type and any orientation or stacking restrictions supplied by the manufacturer. Identify where the installation manual, keys and first-use parts are packed. The installer should be able to locate them without opening every case.

Handle a late or repacked piece

If a supplier moves a motor from crate 03 to crate 05 after inspection, update both lines. Record the revision date, new weights and any dimension changes. Send the same revision to the buyer, warehouse and freight planner. Keep the old version marked superseded so it cannot quietly become the list used for booking.

Agree how the warehouse reports a mismatch

Ask receiving staff to record the piece ID, time, visible condition and a photo when a mark is missing or the count differs. Agree who can authorize release with an open discrepancy. At delivery, the plant can check the same IDs against the latest list and tell the supplier exactly which package needs attention.